Proyects

200 E Las Olas Boulevard

The Project was conducted under the general supervision of Mike Miller (Stiles Construction Co.) and consisted of the remodeling of the lobby floor including corridors and elevators (approximately 2000 square feet).

We used two different types of marble (ivory cream and limestone dark) on which we had to do a lot of work to achieve that the circle perfectly matches both in size and location with respect to plans and furniture made in combination.

All
Before
After
01 - 200 E Las Olas Boulevard

Commercial

Before

Flooring Paquet and Wall Tile

02 - 200 E Las Olas Boulevard

Commercial

Before

Flooring Paquet and Wall Marble

03 - 200 E Las Olas Boulevard

Commercial

Before

Flooring Paquet and Wall Marble

04 - 200 E Las Olas Boulevard

Commercial

After

Vinyl marron roble

05 - 200 E Las Olas Boulevard

Commercial

After

Vinyl marron roble

06 - 200 E Las Olas Boulevard

Commercial

After

Vinyl marron roble