Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

Bathroom – Downtown

If you’re looking to renovate your bathroom in Edgewater, Miami, we have a team of professionals who are ready to work with you to achieve the best result. From the initial design concept to the finishing touches, we are dedicated to creating a space that meets all your needs and exceeds your expectations. With our expertise and attention to detail, you can trust us to deliver exceptional results that you will love for years to come

Balconies – Edgewater

Make the most of your balcony space with our renovation services in Edgewater, Miami. Our team of professionals will work with you to achieve the best possible result, ensuring that your balcony is not only functional but also beautiful and stylish. From new flooring and railing to custom features like built-in seating or planters, we can transform your balcony into a comfortable and inviting outdoor living space that you’ll love to spend time in.»

200 E Las Olas Boulevard

The Project was conducted under the general supervision of Mike Miller (Stiles Construction Co.) and consisted of the remodeling of the lobby floor including corridors and elevators (approximately 2000 square feet).

Kitchen – Miami

we specialize in kitchen renovation services. Our team of professionals is dedicated to helping you achieve the best possible results for your kitchen renovation project. We work closely with you to understand your needs and preferences, and provide personalized advice and recommendations to ensure that your new kitchen meets all of your expectations. With our expertise and attention to detail, we are confident in our ability to deliver exceptional results that exceed your expectations.

Griffin Pointe

The General Direction of the Project was carried out by Hernandez Construction Co. and consisted in the installation of the entire.

MJ Simpson

Project carried out between July and August 2018 in a period of approximately 40 days.

Simon Orthodontics

Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

Sheltair (Private Airport)

Project in which every 6 months different areas and environments of the airport are renewed. It started in 2010 and as of the date (2019) works continue to be carried out, so that Sheltair is constantly evolving.