Therapeeds

Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

200 E Las Olas Boulevard

The Project was conducted under the general supervision of Mike Miller (Stiles Construction Co.) and consisted of the remodeling of the lobby floor including corridors and elevators (approximately 2000 square feet).

Griffin Pointe

The General Direction of the Project was carried out by Hernandez Construction Co. and consisted in the installation of the entire.

MJ Simpson

Project carried out between July and August 2018 in a period of approximately 40 days.

Simon Orthodontics

Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

Sheltair (Private Airport)

Project in which every 6 months different areas and environments of the airport are renewed. It started in 2010 and as of the date (2019) works continue to be carried out, so that Sheltair is constantly evolving.

Cornerstone

What has been done so far consisted on installation of: 5th floor reception lobby in 6 x 6″ antique mosaic (700 sf) whose surface had to imitate the same curvature as the ceiling.