SGWS Wynwood

SGWS Wynwood Project carried out between August/November 2019 in a period of approximately 70 days. The General Direction of the Project was carried out by MJ Simpson. and consisted in the installation of different materials such as Ceramic, Porcelain, Marble, Brick Veneer and Hardwood as follows: Reception Area: 12×24″ black marble tile (1000 square feet) […]

Hard Rock Stadium (Mexican Restaurant)

The Project consisted in coating the bar counter situated at the heart of the restaurant with 8×8″ Mexican slabs that had different shades of green (700 sf), and 3×6″ travertine marble tiles on the surrounding floor (2000 sf).  Share us on:

Hard Rock Stadium (Lobby)

The General Project Management was carried out by Herman Construction and consisted on the remodeling of 72 Club and the South Gate Lobby’s floor (5,000 sf) which was done by placing tiles of 7 different sizes forming squares of 8×8 sf and then installing these pattern one next to another until covering the entire surface. […]

Therapeeds

Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

200 E Las Olas Boulevard

The Project was conducted under the general supervision of Mike Miller (Stiles Construction Co.) and consisted of the remodeling of the lobby floor including corridors and elevators (approximately 2000 square feet).

Griffin Pointe

The General Direction of the Project was carried out by Hernandez Construction Co. and consisted in the installation of the entire.

MJ Simpson

Project carried out between July and August 2018 in a period of approximately 40 days.

Simon Orthodontics

Project carried out in September/October of 2018 from scratch, in a period of approximately 40 days that consisted in the installation of 2,500 sf of floors at a 45° angle, 3 bathrooms and 1,500 sf of relief slab walls.

Sheltair (Private Airport)

Project in which every 6 months different areas and environments of the airport are renewed. It started in 2010 and as of the date (2019) works continue to be carried out, so that Sheltair is constantly evolving.