Hard Rock Stadium (Lobby)

Com-Proj-HR-Lobby-000-

The General Project Management was carried out by Herman Construction and consisted on the remodeling of 72 Club and the South Gate Lobby’s floor (5,000 sf) which was done by placing tiles of 7 different sizes forming squares of 8×8 sf and then installing these pattern one next to another until covering the entire surface. Once installed the whole area, the joints between tiles were filled with epoxi grout.