Hard Rock Stadium (Store/Corridor/Restrooms)

Com-Proj-HR-Mix-fotos-002

The General Project Management was carried out by Herman Construction and consisted on:

  • Installation of 12×24″ travertine marble tiles on the store’s floor (800 sf).
  • Installation of 6×3″ travertine marble tiles on the commercial’s area hallway (1,000 sf)
  • Installation of blue wood look ceramic tile (floors) and white 6×3″ ‘subway’ tile (walls) on both men and women restrooms.

Share us on: